Facilities & Maintenance
-
Limited Contamination Assessment 11/24/25John Kelley Elementary School: Safeguard EnviroGroup Limited Contamination Assessment – Airborne and Surface Fungal Structures report for Project No. 44-66-605, dated November 24, 2025. Based on the limited assessment, observations, data collected, and laboratory analysis, results indicated evidence of indoor mold contamination.
-
Limited Asbestos and Lead-Based Paint SurveySafeguard EnviroGroup Limited Asbestos and Lead-Based Paint Survey report for Project No. 44-67-058ASLD, dated December 5, 2025. Based on the limited assessment and samples collected, laboratory results indicated no asbestos-containing materials were identified, and lead-based paint levels were below applicable regulatory action thresholds.
-
Post Mold Remediation Verification 12/15/25Safeguard EnviroGroup Post Mold Remediation Verification Report for Project No. 44-67-284PRV, dated December 15, 2025, indicates that based on visual and olfactory observations, field data, and laboratory analysis (if required), the designated work areas passed clearance criteria at the time of inspection.
-
Limited Contamination Assessment 12/22/25John Kelley Elementary School: Safeguard EnviroGroup Limited Contamination Assessment – Airborne and Surface Fungal Structures report for Project No. 44-67-405 dated December 22, 2025. Based on the limited assessment, observations, data collected, and laboratory analysis, results indicated evidence of indoor mold contamination.
-
Post Mold Remediation Verification 12/30/25John Kelley Elementary School: Safeguard EnviroGroup Post Mold Remediation Verification (PRV) Report for Project Number: 44-67-669PRV, dated December 30, 2025, indicates that based on visual and olfactory observations, field data, and laboratory analysis (if required), the designated work areas passed clearance criteria at the time of inspection.
-
Post Mold Remediation Verification 1/2/26John Kelley Elementary School: Safeguard EnviroGroup Post Mold Remediation Verification (PRV) Report for Project Number: 44-67-758PRV, dated January 2, 2026, indicates that based on visual and olfactory observations, field data, and laboratory analysis (if required), the designated work areas passed clearance criteria at the time of inspection.
Additional settings for Safari Browser.
